Install & Projects
Manufacturing to opening day, gated on site readiness before any crew or container ships.
Active installs
3
On the calendar now
Next opening
Jul 26
Altitude Woodbridge
Gates blocked
2
Fire approval · Frisco, TX
The Play Company #8
ManufacturingFrisco, TX · NLP-1031 · $980k build
Manufacturing45%
Install start Aug 18Opens Oct 6Crew Crew A (unassigned)
Site readiness gate
2/4- ✓Level floor poured
- ✓HVAC commissioned
- Fire authority approval
- Power drops set
Crew held until gate clears. Launching early risks demurrage and idle-crew cost.
Altitude Woodbridge
InstallWoodbridge, VA · NLP-1024 · $265k build
Install72%
Install start Jul 7Opens Jul 26Crew Crew B + 4 local
Site readiness gate
4/4- ✓Zone closed off
- ✓Old airbag removed
- ✓Anchor points verified
- ✓Night-shift access
Jump Yard KC
ShippingKansas City, MO · NLP-1029
Shipping60%
Install start Jul 21Opens Sep 1Crew Crew A
Site readiness gate
2/4- ✓Level floor poured
- HVAC commissioned
- ✓Fire authority approval
- Loading dock cleared
Crew held until gate clears. Launching early risks demurrage and idle-crew cost.
Each install is gated on site readiness. The floor, HVAC, and fire approval are confirmed before a crew or a container ships, so nothing sits waiting at cost.