Project Hub
One thread per build: every message, approval, and doc between your team and the operator, in one place.
The Play Company #8
Frisco, TX · NLP-1031 · Manufacturing
Frisco drawings v3 are up for sign-off: soft-play top level plus the trampoline zone layout.
Frisco_layout_v3.pdfLooks great. One change, can we widen the toddler zone by 4 ft?
Done. v4 attached with the toddler zone widened. Approve to release to the factory.
Frisco_layout_v4.pdfApproved by Marcus, The Play Co · released to the factory
Fire marshal inspection is booked Aug 14. Does that work for install?
Yes, install crew is locked for Aug 18, opening Oct 6. Sending the site-readiness checklist so your GC has HVAC and power set first.
Site-readiness checklistThis build
- Open approvals
- 0
- Shared docs
- 3
- Ship target
- Aug 8
- Install
- Aug 18
- Opening
- Oct 6
Why it matters
Every day the operator spends waiting on a drawing adds a day to a paid timeline. One thread keeps approvals moving and the operator informed.